Reno Factory

Reno FactoryReno FactoryReno Factory

Reno Factory

Reno FactoryReno FactoryReno Factory
  • Home
  • Price List
  • HDB Package
  • Repair Works
  • Types of tiles
  • Bathtub
  • HDB Permit
  • Find Us
  • More
    • Home
    • Price List
    • HDB Package
    • Repair Works
    • Types of tiles
    • Bathtub
    • HDB Permit
    • Find Us

  • Home
  • Price List
  • HDB Package
  • Repair Works
  • Types of tiles
  • Bathtub
  • HDB Permit
  • Find Us

price list

Preparation works

Works required for all project

Material and haulage works / per head count

$180

To supply cement, work material OR labour for haulage of site materials, tiles, screed OR other renovation materials hauling to work site, lift lobby, upper level, staircase, inaccessible area. per day / per man

Protection canvas / corrugated sheet / per area

$250

To supply material and labour to lay corrugated protection sheet, clear plastic cover sheet, cardboard protection, canvas sheet, 3mm plywood OR other protection material at working site. Per work area. 

NEA disposal and waste removal works / per trip

$350

To supply labour for 1x one ton jumbo bag disposal, 10ft lorry removal and disposal works. For EXAMPLE; existing renovation debris, tiles, materials, disposal items, waste disposal OR general disposal services. EXCLUDE placement of disposal bin or skip tank

Chemical wash and general cleaning / per area

$230

To supply labour for chemical wash and general cleaning for post renovation works.  Per work area.

HDB Renovation permit / administrative fee

$300

Submission of HDB renovation permit, administration charges, documentation and other processing fee.


Cementitious / masonry wet works / 700 sqft above

Price listed is exclude tile supply and based on standard HDB 2.6m height

Hacking and demolition works

$6.20 psf

To supply labour for hacking and demolition works. For EXAMPLE; existing wall and floor tiles, bathroom tiles, floor screed, bathtub, vanity top, screen shower, toilet bowl, kitchen cabinets, bedroom wardrobe, living room fixtures, staircase railing OR other fixed fixtures. BCA certified. EXCLUDE all disposal, cleaning services. $66.71/sqm

Tiling works for homogeneous / ceramic / porcelain material

$10.30 psf

To supply labour for adhesive cement material to tile homogeneous, ceramic, porcelain, mosaic tiling works. For EXAMPLE; wall, floor, kitchen countertop, sink, bathroom, living room, kitchen, bedroom, balcony, pool, side terrace, patio, backyard, staircase OR other tiling works. *EXCLUDE tiles selection @ Soon Bee Huat, Hafary. Based on standard HDB 2.6m height. EXCLUDE all disposal, cleaning services. $110.80/sqm

Construction of brick masonry works

$8.30 psf

To supply labour and cement material for brick works construction. For EXAMPLE; kitchen mortar, washing machine base, kitchen sink, boundary wall, carpark, patio, swimming pool, bathroom curb, low wall, brick wall OR other brick construction works. EXCLUDE all disposal, cleaning services. $89.30/sqm


Concrete , floor screed, ceiling repair and other cement works

$9.50 psf

To supply labour for cementitious material works. For EXAMPLE; W1 cement strengthener application, wall render plaster, floor screed, ceiling repair works OR any masonry works. EXCLUDE all disposal, cleaning services. $102.22/sqm


wall surface finishing work / skim coat

$5.85 psf

To supply labour and wall plaster / skim coat / Easi Plaster / S11 for wall finishing work. For EXAMPLE;  doorway, wall surface,  ceiling, corridor, living room, kitchen wall OR other surface compound finishing works. EXCLUDE all disposal, cleaning services. $63.00/sqm


Additional works

Dismantle of accessories / per bathroom

$350

To supply labour to dismantle and disposal of bathroom accessories installation works. For EXAMPLE; rain shower, towel hanger, bidet spray, trays, mirror, toilet paper holder OR other bathroom accessories. EXCLUDE toilet bowl, vanity cabinet top, bathroom sink, shower screen, instant or water tank heater OR other fixed items.  

Essential installation / per item

$180

To supply labour for bathroom installation for EXAMPLE; heater tank, water heater, bathroom vanity cabinet, screen shower, bathroom sink, toilet bowl, bathtub. EXCLUDE other bathroom accessories. 


Non-essential installation / per bathroom

$400

To supply labour for bathroom accessories installation works. For EXAMPLE; rain shower, towel hanger, bidet spray, trays, mirror, toilet paper holder OR other bathroom accessories. EXCLUDE bathroom essentials, toilet bowl, vanity cabinet, bathroom sink, shower screen, bathtub, instant or water tank heater OR other fixed items.


DRAINAGE WORKS - OUTLET POINT alternation works / per point

$350

To supply labour to hack and lay PVC drainage points works. For EXAMPLE; kitchen sink pipe, washing machine outlet pipe, bathroom drainage pipe, garden, backyard, carpark OR any drainage alternation / drainage works NOT exceeding 3M in length. 

Price stated is based on full renovation works. Price is not applicable for partial works.

  • Home
  • Price List
  • HDB Package
  • Repair Works
  • Types of tiles
  • HDB Permit
  • Find Us

Reno Factory

UEN 53402357J RENO FACTORY Expiry: 27 August 2028. HDB License No. HB-08-6215E Expiry: 6 August 2026

Primary Business Activity: General Contractors (Non-building Construction)(42101) Secondary Business Activity: Renovation Contractors (43301) 

Office address: 80 Genting Lane, #04-08, Ruby Industrial Complex, Singapore 349565. Subsidiary Company:  UEN 202312205N TILER AND RENO PTE LTD 

Powered by